specialised & efficient design
Thanks to cepezed’s kit of parts method, construction will progress rapidly, with an expected move-in date of October 2027. The total floor area will double to 20,000 square meters, with one third dedicated to offices and the rest to standard laboratories. Specialised labs, including growth chambers, aquariums, and vibration-free, light-controlled environments, will be housed on the lower floors. At the same time, the ground floor façade remains as open as possible, offering visibility into the building’s activities and housing shared functions such as meeting rooms, a restaurant, a garden, the greenhouse, and pantry’s. The interior design encourages collaboration, ensuring that The Bridge truly connects its users.