Cookies that the site cannot function properly without. This includes cookies for access to secure areas and CSRF security. Please note that Craft’s default cookies do not collect any personal or sensitive information. Craft's default cookies do not collect IP addresses. The information they store is not sent to Pixel & Tonic or any 3rd parties.
Name: CraftSessionId
Description: Craft relies on PHP sessions to maintain sessions across web requests. That is done via the PHP session cookie. Craft names that cookie “CraftSessionId” by default, but it can be renamed via the phpSessionId config setting. This cookie will expire as soon as the session expires.
Provider: this site
Expiry: Session
Name: *_identity
Description: When you log into the Control Panel, you will get an authentication cookie used to maintain your authenticated state. The cookie name is prefixed with a long, randomly generated string, followed by _identity. The cookie only stores information necessary to maintain a secure, authenticated session and will only exist for as long as the user is authenticated in Craft.
Provider: this site
Expiry: Persistent
Name: *_username
Description: If you check the "Keep me logged in" option during login, this cookie is used to remember the username for your next authentication.
Provider: this site
Expiry: Persistent
Name: CRAFT_CSRF_TOKEN
Description: Protects us and you as a user against Cross-Site Request Forgery attacks.
Provider: this site
Expiry: Session
always active
Statistic cookies help us understand how visitors interact with websites by collecting and reporting information anonymously.
Marketing cookies are used to track visitors across websites. The intention is to display ads that are relevant and engaging for the individual user and thereby more valuable for publishers and third party advertisers.
Functional cookies are used for site functionality sourced from outside this website that are not pertinent to the site's main functionality, but provide additional functionality to enhance the user experience. Note that these can have their own cookie policies.
Name: vimeo
Description: https://vimeo.com/legal/privacy/cookies
Provider: Vimeo
Expiry: Persistant

we use cookies to personalize content and ads, and to analyze our traffic and improve our service.

| edit preferences
Cookies
  • projects
  • method
  • team
  • disciplines
    architecture project development construction coordination interior
    architecture project development construction coordination interior
  • Linkedin Youtube
    nl | en
  • nl | en
Exterieur stadsarchief amsterdam cepezed

Amsterdam City Archives Depot North

clients(s)

BAM Bouw & Techniek

location

Amsterdam

users(s)

Stadsarchief Amsterdam

The City Archives on the Vijzelstraat in Amsterdam were struggling with a shortage of suitable storage space. For this reason, the Municipality of Amsterdam commissioned the realization of an additional archive repository. In collaboration with cepezed, BAM Bouw en Techniek was selected through a European tendering procedure for this Design, Build & Maintenance assignment.
Render overzicht stadsarchief amsterdam cepezed

Cepezed

Plot-filling complex 

The new four-storey Depot Amsterdam-North is located on the Cornelis Douwes terrain, on the corner of the Tt. Vasumweg and the Internetstraat.

Apart from a narrow enclosed patio at the rear, the 2,665 m² building fills almost the entire plot. Accessed from the Internetstraat via a heavy gate, this patio serves as the first security shell of the complex, as well as parking for staff and visitors. It also provides access to the delivery area.
gevel kruis zonnepanelen stadsarchief cepezed

ruimte_werknemers_stadsarchief_amsterdam_lucasvanderwee_cepezed

Gevel perspectief stadsarchief amsterdam cepezed

Energy-neutral repository 

The completely flat anthracite-coloured façade cladding gives the building a bold, robust appearance. Careful detailing contributes greatly to the high-quality appearance. The wide ribbon of PV panels on the façade is light grey for a ton-sur-ton effect.

The roof is equipped with 1,644 m² of PV panels, which more than meets the ‘zero-on-the-meter’ archive building’s own energy requirements. The depot has an energy performance coefficient of 0. The electricity surplus is returned to the grid. The aforementioned patio is laid out with grass stones and plants and has a water retention capacity of over 150 m² for excess rainwater.

Total cost of ownership 

The project focuses on minimal use of materials, high sustainability and efficiency in management and maintenance. The use of prefabricated components with standard system sizes guarantees clean and fast assembly, with the possibility of disassembly and reassembly. This construction method, which is frequently used by cepezed, fits in seamlessly with the ambitions of the Municipality of Amsterdam to contribute to the circular economy.

The sustainable, circular depot building was completed in November 2019.
Verdiepingen stadsarchief amsterdam cepezed

Archief stadsarchief amsterdam cepezed

Render interieur stadsarchief amsterdam cepezed

Cepezed

Focal point of deliveries 

The truck dock is an integral area where the electric vehicles can load and unload safely while keeping dry. The dock is centrally located in the building layout and has been optimized for an efficient work process. The staff canteen, office space and the various support functions are situated around the dock. All the spaces have glass fronts.

The incoming archive materials are separated in the intake area into a so-called dirty stream and clean stream. In the dirty areas, materials are cleaned and, if necessary, quarantined. Clean archive materials go to the registration area or directly to the depots. These are accessible via a central zone, equipped with a lift and staircases.

45 kilometres of archive 

The repositories, which hold more than 45 kilometres of archive shelves, are logically and conveniently arranged and each level is separately accessible. A special feature is that the halls do not have any structural storey floors. The filing cabinets cover the full height and the floors consist of wooden panels between the cabinets.

For the best archiving conditions and energy saving, the climate control is organized according to the so-called Scandinavian model, with a minimum of building service systems.
Dossiermappen stadsarchief amsterdam cepezed

Lift_stadsarchief_amsterdam_lucasvanderwee_cepezed

contact

mail bd@cepezed.nl or call our
business development team
on +31 (0)15 2150000

partners 

client: gemeente amsterdam
contractual client: bam bouw & techniek
interior design: cepezedinterieur
stability: bam bouw & techniek
contractor building services: Halmos Adviseurs, Wassenaar
building services, building physics & sustainability: dgmr
main contractor: bam bouw & techniek
contractor steel construction: Vic Obdam

related projects

EYE Collection Centre Amsterdam

Exterieur collectiegebouw eye cepezed

Collection Centre Netherlands

entree_ccnl_lucasvanderwee_cepezed

Woerden Town Hall

Receptie gemeentehuis woerden cepezed

Recent Vacancies Contact
Linkedin Youtube
nl nederlands   |   en english