Tim studied Architectural Engineering at TU Delft. For his graduation project, Kampung Circularity, he designed a fully demountable building in Indonesia, using local waste streams as a source of building materials.
By 2026, Tim and cepezed already knew each other well. From 2019 to 2024, he worked at the practice as an architect, before spending two years as a project manager at HEVO, where he was involved in the building process from initial concept through to completion. He now brings that experience back into the design process, considering what is feasible from the very first idea. Bringing the project management role in-house in this way ensures that design quality is considered alongside programme and budget.
What appeals to Tim about cepezed is the combination of design quality and buildability. He values the search for sustainable and flexible solutions, from demountable structures to buildings that can adapt to changing uses. ‘A building should be a functional product with aesthetic quality. Aesthetic quality and flexibility together form the basis for a building’s long-term preservation,’ says Tim.
At cepezed, Tim has worked on projects including Accelerator in Utrecht, which brings together office and laboratory functions, and the police complex in Drachten, which includes facilities for forensic investigation. The police complex in particular demonstrates what cepezed’s consistent methodology can achieve when applied across several buildings. Tim also worked on the bridges added to the design of the Smart Mobility Hub. For him, an infrastructure project like this provides an interesting change from designing buildings. ‘I enjoy seeing how structure and architecture can come together seamlessly,’ says Tim.