Cookies that the site cannot function properly without. This includes cookies for access to secure areas and CSRF security. Please note that Craft’s default cookies do not collect any personal or sensitive information. Craft's default cookies do not collect IP addresses. The information they store is not sent to Pixel & Tonic or any 3rd parties.
Name: CraftSessionId
Description: Craft relies on PHP sessions to maintain sessions across web requests. That is done via the PHP session cookie. Craft names that cookie “CraftSessionId” by default, but it can be renamed via the phpSessionId config setting. This cookie will expire as soon as the session expires.
Provider: this site
Expiry: Session
Name: *_identity
Description: When you log into the Control Panel, you will get an authentication cookie used to maintain your authenticated state. The cookie name is prefixed with a long, randomly generated string, followed by _identity. The cookie only stores information necessary to maintain a secure, authenticated session and will only exist for as long as the user is authenticated in Craft.
Provider: this site
Expiry: Persistent
Name: *_username
Description: If you check the "Keep me logged in" option during login, this cookie is used to remember the username for your next authentication.
Provider: this site
Expiry: Persistent
Name: CRAFT_CSRF_TOKEN
Description: Protects us and you as a user against Cross-Site Request Forgery attacks.
Provider: this site
Expiry: Session
always active
Statistic cookies help us understand how visitors interact with websites by collecting and reporting information anonymously.
Marketing cookies are used to track visitors across websites. The intention is to display ads that are relevant and engaging for the individual user and thereby more valuable for publishers and third party advertisers.
Functional cookies are used for site functionality sourced from outside this website that are not pertinent to the site's main functionality, but provide additional functionality to enhance the user experience. Note that these can have their own cookie policies.
Name: vimeo
Description: https://vimeo.com/legal/privacy/cookies
Provider: Vimeo
Expiry: Persistant

we use cookies to personalize content and ads, and to analyze our traffic and improve our service.

| edit preferences
Cookies
  • projects
  • method
  • team
  • disciplines
    architecture project development construction coordination interior
    architecture project development construction coordination interior
  • Linkedin Youtube
    nl | en
  • nl | en

11 May 2020

super swift realization: prefab concrete skeleton wolfert lansing

Exterieur cd20 prefab betonconstructie wolfert lansing cepezed

The concrete stability structure for the new Wolfert Lansing building in Bergschenhoek has been realized at breakneck speed. The school for pre-vocational secondary education, intermediate general secondary education and the junior years of higher general secondary education will be more than 5.500 m² and three floors high. The supporting structure of the cepezed and cepezedinterieur designed building was completed in only three weeks.

prefab concrete system

For the stability structure of the building, cepezed has used the modular and beamless concrete system CD20. This consist of slender columns measuring 20 by 20 cm with large floor slabs also of only 20 cm on top of them. The fast realization is possible because of steel fastening elements incorporated in the concrete. But the system has other important benefits as well.

important benefits


• clean assembly, hardly any concrete poured in situ
• great precision due to prefab industrial quality
• weight and material savings due to slender elements
• beamless and therefore no obstacles for installations
• limitation of the façade surface through lower storey height with equal free height
• flexibly arrangeable and therefore future-proof
• easily expandable and adaptable both horizontally and vertically
• easily demountable and reusable

The standardized construction system is also very cost-efficient and ensures that the project can be realized with high quality within budget. If everything proceeds as smoothly as the assembly of the skeletal system, the pupils can already move into the brand new education building by the fall of 2020!
Atrium cd20 prefab betonconstructie wolfert lansing cepezed

Doorsnede cd20 prefab betonstructuur wolfert lansing cepezed

Balustrade cd20 prefab betonconstructie wolfert lansing cepezed

Gang cd20 prefab betonconstructie wolfert lansing cepezed

Wolfert exterieur 1

wolfert lansing

bergschenhoek


Recent Vacancies Contact
Linkedin Youtube
nl nederlands   |   en english