Cookies that the site cannot function properly without. This includes cookies for access to secure areas and CSRF security. Please note that Craft’s default cookies do not collect any personal or sensitive information. Craft's default cookies do not collect IP addresses. The information they store is not sent to Pixel & Tonic or any 3rd parties.
Name: CraftSessionId
Description: Craft relies on PHP sessions to maintain sessions across web requests. That is done via the PHP session cookie. Craft names that cookie “CraftSessionId” by default, but it can be renamed via the phpSessionId config setting. This cookie will expire as soon as the session expires.
Provider: this site
Expiry: Session
Name: *_identity
Description: When you log into the Control Panel, you will get an authentication cookie used to maintain your authenticated state. The cookie name is prefixed with a long, randomly generated string, followed by _identity. The cookie only stores information necessary to maintain a secure, authenticated session and will only exist for as long as the user is authenticated in Craft.
Provider: this site
Expiry: Persistent
Name: *_username
Description: If you check the "Keep me logged in" option during login, this cookie is used to remember the username for your next authentication.
Provider: this site
Expiry: Persistent
Name: CRAFT_CSRF_TOKEN
Description: Protects us and you as a user against Cross-Site Request Forgery attacks.
Provider: this site
Expiry: Session
always active
Statistic cookies help us understand how visitors interact with websites by collecting and reporting information anonymously.
Marketing cookies are used to track visitors across websites. The intention is to display ads that are relevant and engaging for the individual user and thereby more valuable for publishers and third party advertisers.
Functional cookies are used for site functionality sourced from outside this website that are not pertinent to the site's main functionality, but provide additional functionality to enhance the user experience. Note that these can have their own cookie policies.
Name: vimeo
Description: https://vimeo.com/legal/privacy/cookies
Provider: Vimeo
Expiry: Persistant

we use cookies to personalize content and ads, and to analyze our traffic and improve our service.

| edit preferences
Cookies
  • projects
  • method
  • team
  • disciplines
    architecture project development construction coordination interior
    architecture project development construction coordination interior
  • Linkedin Youtube
    nl | en
  • nl | en

17 Oct 2022

Prefab sanitary units electrically placed in PI Haaglanden

WEB220926 MG 5763 Lucasvanderwee

Last week a series of prefab sanitary units were lifted into place for a new temporary care centre in the inner courtyard of the PI Haaglanden in Scheveningen, entirely electrically. The other building components were also assembled from prefab components. This helps keep nitrogen emissions exceptionally low, even below the current standard.

dune plants
The temporary care centre consists of a two-storey main building with three perpendicular, single-storey wings. The main building is intended for general functions such as the pharmacy and 'polyclinic'. The wings contain the cells for sick inmates. From their beds, they have a view towards the garden, which is planted with dune plants.

solid dividing wall
The concrete prefab units are intended for the sanitary facilities in the wings. They are designed with all kinds of smart details. The ceiling, for instance, already features a shaft for air intake and a buffer for noise. As a result, the wooden roof can simply be lifted in place. The prefab units structurally support the wooden roof and serve as a solid seperating wall between the cells. The shower head and toilet bowl are fixed on the outside. In this way, the inmates cannot unscrew them from the inside.

nitrogen emissions
Partly due to the PI's location which is close to a protected Natura 2000 dune area, bio-based materials like the wooden roofs were chosen, if possible. Its exceptional is that construction is done almost entirely electric. Since assembly of the prefab components is dry and the foundation piles are screwed, the nitrogen emissions for this project are even lower than currently required by law. The emissions will be monitored during the construction to determine how low they actually were.

The completion of the Judicial Care Centre is scheduled for summer 2023.
Pi scheveningen cepezed 5739 Lucasvanderwee

Pi scheveningen cepezed 5670 Lucasvanderwee

009 PI haaglanden cepezed

PI Haaglanden Care Centre

Den Haag


Recent Vacancies Contact
Linkedin Youtube
nl nederlands   |   en english