Cookies that the site cannot function properly without. This includes cookies for access to secure areas and CSRF security. Please note that Craft’s default cookies do not collect any personal or sensitive information. Craft's default cookies do not collect IP addresses. The information they store is not sent to Pixel & Tonic or any 3rd parties.
Name: CraftSessionId
Description: Craft relies on PHP sessions to maintain sessions across web requests. That is done via the PHP session cookie. Craft names that cookie “CraftSessionId” by default, but it can be renamed via the phpSessionId config setting. This cookie will expire as soon as the session expires.
Provider: this site
Expiry: Session
Name: *_identity
Description: When you log into the Control Panel, you will get an authentication cookie used to maintain your authenticated state. The cookie name is prefixed with a long, randomly generated string, followed by _identity. The cookie only stores information necessary to maintain a secure, authenticated session and will only exist for as long as the user is authenticated in Craft.
Provider: this site
Expiry: Persistent
Name: *_username
Description: If you check the "Keep me logged in" option during login, this cookie is used to remember the username for your next authentication.
Provider: this site
Expiry: Persistent
Name: CRAFT_CSRF_TOKEN
Description: Protects us and you as a user against Cross-Site Request Forgery attacks.
Provider: this site
Expiry: Session
always active
Statistic cookies help us understand how visitors interact with websites by collecting and reporting information anonymously.
Marketing cookies are used to track visitors across websites. The intention is to display ads that are relevant and engaging for the individual user and thereby more valuable for publishers and third party advertisers.
Functional cookies are used for site functionality sourced from outside this website that are not pertinent to the site's main functionality, but provide additional functionality to enhance the user experience. Note that these can have their own cookie policies.
Name: vimeo
Description: https://vimeo.com/legal/privacy/cookies
Provider: Vimeo
Expiry: Persistant

we use cookies to personalize content and ads, and to analyze our traffic and improve our service.

| edit preferences
Cookies
  • projects
  • method
  • team
  • disciplines
    architecture project development construction coordination interior
    architecture project development construction coordination interior
  • Linkedin Youtube
    nl | en
  • nl | en

08 May 2019

cepezed wins tender police unit office the hague

Render exterieur politie eenheidsbureau den haag cepezed

cepezed, cepezedinterior, IMd structural engineering, Buro Sant & Co and Engineering firm Multical jointly won the design tender for the new Unit Office The Hague of the police. In a separate procedure, engineering firm Nelissen was selected for the MEP, HVAC and IT-design.

Prominently visible from the Utrechtsebaan, the more than 55.000 m² building will be realized at the border of the former industrial district De Binckhorst. The design is closely aligned with both the existing urban character there and the current developments aimed at a mix of living, working and recreational functions in an industrial atmosphere. The building will be omni-directional, will have a high degree of transparency and will explicitly connect to existing building heights, street profiles and sightlines.

The new Unit Office will accommodate police departments that are currently divided over multiple locations, including the current headquarters of the police unit The Hague, now located on the Burgemeester Patijnlaan. With a lot of physical and visual connections, the new construction is specifically designed for interdisciplinary collaboration. In the design proposal, the complex brief is roughly divided over three stacked building sections: a plinth with an open character and ground-based functions, a middle section with parking space and an upper part with all meeting, office and cooperation functions.

In the proposal, the substructure is intersected by a ‘canyon’ with an important function in the access, routing, orientation and incidence of daylight. The parking layers have been designed such that they can later also be transformed into offices. The superstructure with an accentuated height consists of a flexibly arrangeable structure with five bays. In between these bays, there are atriums and patios that, just like the canyon, allow for lots of daylight and function as meeting places as well. A part of the superstructure is intended for both formal and informal consultation between different expertises and between police and external partners. The conference center and restaurant are examples of functions situated here.

In the proposal, the building is equipped with south-oriented, spacious roof gardens, which are directly connected to the restaurant and cooperation area and look out over the rest of de Binckhorst as well as over the skyline of The Hague. In addition, the roof surfaces are provided with solar panels that contribute to the design meeting the norms for a BREEAM Very Good certification.

The generic structure of the design offers good possibilities to further optimize the integration of all work processes during the design process. It is expected that the new Unit Office will be taken into use by the end of 2023.

The artist impressions show the winning sketch design from the competition phase and will be elaborated during the design process.
Render hal politie eenheidsbureau den haag cepezed

Render atrium politie eenheidsbureau den haag cepezed

Render situatie politie eenheidsbureau den haag cepezed

20201118 c001

Police Headquarters The Hague

Den Haag


Recent Vacancies Contact
Linkedin Youtube
nl nederlands   |   en english