Cookies that the site cannot function properly without. This includes cookies for access to secure areas and CSRF security. Please note that Craft’s default cookies do not collect any personal or sensitive information. Craft's default cookies do not collect IP addresses. The information they store is not sent to Pixel & Tonic or any 3rd parties.
Name: CraftSessionId
Description: Craft relies on PHP sessions to maintain sessions across web requests. That is done via the PHP session cookie. Craft names that cookie “CraftSessionId” by default, but it can be renamed via the phpSessionId config setting. This cookie will expire as soon as the session expires.
Provider: this site
Expiry: Session
Name: *_identity
Description: When you log into the Control Panel, you will get an authentication cookie used to maintain your authenticated state. The cookie name is prefixed with a long, randomly generated string, followed by _identity. The cookie only stores information necessary to maintain a secure, authenticated session and will only exist for as long as the user is authenticated in Craft.
Provider: this site
Expiry: Persistent
Name: *_username
Description: If you check the "Keep me logged in" option during login, this cookie is used to remember the username for your next authentication.
Provider: this site
Expiry: Persistent
Name: CRAFT_CSRF_TOKEN
Description: Protects us and you as a user against Cross-Site Request Forgery attacks.
Provider: this site
Expiry: Session
always active
Statistic cookies help us understand how visitors interact with websites by collecting and reporting information anonymously.
Marketing cookies are used to track visitors across websites. The intention is to display ads that are relevant and engaging for the individual user and thereby more valuable for publishers and third party advertisers.
Functional cookies are used for site functionality sourced from outside this website that are not pertinent to the site's main functionality, but provide additional functionality to enhance the user experience. Note that these can have their own cookie policies.
Name: vimeo
Description: https://vimeo.com/legal/privacy/cookies
Provider: Vimeo
Expiry: Persistant

we use cookies to personalize content and ads, and to analyze our traffic and improve our service.

| edit preferences
Cookies
  • projects
  • method
  • team
  • disciplines
    architecture project development construction coordination interior
    architecture project development construction coordination interior
  • Linkedin Youtube
    nl | en
  • nl | en

01 Oct 2026

bravis: on solid ground

611000 informatiemarkt nieuwbouw september 2026 2 small

On 1 October, the municipality of Roosendaal officially handed over the construction-ready site on Bulkenaarsestraat to Bravis Hospital. Construction of the new regional hospital can now begin. Team aan de Schie, the architectural collaboration between Vakwerk Architecten and cepezed, is designing it together with the people who will work there. And the project is already a talking point in the region, before a single pile has been driven.

now it really begins
The existing hospital sites increasingly fall short of what modern healthcare demands. In 2019, Bravis therefore chose to build a single new hospital in Roosendaal, serving residents from across the region. The zoning plan is now final and the site is ready for construction. Contractor consortium FourCare starts work straight away. The first piles are expected to go in at the end of November. “After an extensive preparation phase, we can now start building a modern, sustainable hospital, centrally located in our catchment area,” says Albert-Jan Mante, executive board member at Bravis.

two hundred staff at the table
In working groups and conferences, more than two hundred Bravis staff decide with us how the building is laid out. We map the hospital’s processes and weigh up which departments need to be close to one another. With them, we test consulting, examination and inpatient rooms in full-scale mock-ups. This shapes a building of four blocks that together form a cloverleaf. Because short walking distances matter to visitors and staff alike, the building revolves around a central heart containing the stairs and lifts. From there, four compact loops run through the blocks.

care with a view
The design is built around the idea of a healing environment, a setting that supports recovery. Views of nature are proven to help. That is why the wings stand apart, letting the surrounding landscape park, De Bulkenaar, run right up to the heart of the building. The stepped blocks make room for roof gardens and keep the landscape in view. Inside, we give each block its own identity through subtle differences in the interior. That helps visitors find their way and reduces stress.

The approach strikes a chord. In late September, several hundred people visited an information market about the new hospital. Alongside practical questions about access and parking, many were curious about the building and the park around it. “I think the building is beautiful, especially because it’s in a park,” said one visitor. “Combining greenery and care is a brilliant choice.”

Team aan de Schie consists of Vakwerk Architecten, cepezed and cepezedinterieur. BoschSlabbers is designing the landscape. The other partners are ABT (structural engineering), Deerns (building services, building physics & sustainability) and Multical (cost estimation). Contractor consortium FourCare is building the hospital.

 

→ Read more on the bravis hospital

9077 informatiemarkt nieuwbouw september 2026 4 small

9110 laj 7388a small


Recent Vacancies Contact
Linkedin Youtube
nl nederlands   |   en english