Cookies that the site cannot function properly without. This includes cookies for access to secure areas and CSRF security. Please note that Craft’s default cookies do not collect any personal or sensitive information. Craft's default cookies do not collect IP addresses. The information they store is not sent to Pixel & Tonic or any 3rd parties.
Name: CraftSessionId
Description: Craft relies on PHP sessions to maintain sessions across web requests. That is done via the PHP session cookie. Craft names that cookie “CraftSessionId” by default, but it can be renamed via the phpSessionId config setting. This cookie will expire as soon as the session expires.
Provider: this site
Expiry: Session
Name: *_identity
Description: When you log into the Control Panel, you will get an authentication cookie used to maintain your authenticated state. The cookie name is prefixed with a long, randomly generated string, followed by _identity. The cookie only stores information necessary to maintain a secure, authenticated session and will only exist for as long as the user is authenticated in Craft.
Provider: this site
Expiry: Persistent
Name: *_username
Description: If you check the "Keep me logged in" option during login, this cookie is used to remember the username for your next authentication.
Provider: this site
Expiry: Persistent
Name: CRAFT_CSRF_TOKEN
Description: Protects us and you as a user against Cross-Site Request Forgery attacks.
Provider: this site
Expiry: Session
always active
Statistic cookies help us understand how visitors interact with websites by collecting and reporting information anonymously.
Marketing cookies are used to track visitors across websites. The intention is to display ads that are relevant and engaging for the individual user and thereby more valuable for publishers and third party advertisers.
Functional cookies are used for site functionality sourced from outside this website that are not pertinent to the site's main functionality, but provide additional functionality to enhance the user experience. Note that these can have their own cookie policies.
Name: vimeo
Description: https://vimeo.com/legal/privacy/cookies
Provider: Vimeo
Expiry: Persistant

we use cookies to personalize content and ads, and to analyze our traffic and improve our service.

| edit preferences
Cookies
  • projects
  • method
  • team
  • disciplines
    architecture project development construction coordination interior
    architecture project development construction coordination interior
  • Linkedin Youtube
    nl | en
  • nl | en
260302 MG 4617 Lucas van der Wee

Lucas van der Wee

Wega.punt

clients(s)

police

location

den haag

users(s)

police

With the arrival of the headquarters of the The Hague police department on the Binckhorst, the need for additional parking capacity emerged. This was addressed by designating the plot of the Police Academy nearby for the construction of a garage with around 400 parking spaces for Police employees. The academy was located in an old office building that could have been demolished. However, cepezed proposed retaining the existing structural frame. Thanks to an ingenious design, precisely aligned with the existing structure, the CO₂ emissions associated with constructing the new parking garage were kept to a minimum. cepezed also opted for reversible elements, allowing the structure to be easily adapted for another function in the future.

Foto bestaand wegastraat BW

spectacular structure 

All new additions are reversible, should the function of the building change in the future. A spectacular structure with ramps and landings has been installed in the existing courtyard. Due to the existing basement foundation, the ramps form a suspended structure: eight new columns pass through the basement slab to avoid loading the existing foundations. For this striking construction, which also makes use of truss tension at the corners due to limited space, we collaborated closely with IMd Raadgevende Ingenieurs. Two corner volumes have been added to the existing floor plan, compensating for the floor space lost when a storey was demolished. This demolition was necessary to relieve the pressure on the foundations caused by heavy vehicles. The additional corner volumes also create circulation routes. 

250205 MG 6206 Lucasvanderwee

Lucas van der Wee

260302 MG 4739 Lucas van der Wee

Lucas van der Wee

260302 MG 4745 Lucas van der Wee

Lucas van der Wee

perforated shell 

A perforated, new shell covering the car park levels hides the cars from view, eliminates the need for mechanical ventilation while allowing daylight to penetrate deep into the structure. On the exterior, the graphic lines of the façade stand out. On the ground floor, dark grey aluminium profiled sheets with horizontal ribs have been installed above hard-wearing, ribbed fibre-reinforced concrete. The upper floors are adorned with a light-coloured cladding with wide, vertical strips of alternating porous and solid aluminium standing seam panels. Because the lines continue across the side walls and ceilings, the ground floor and the car park levels are visually perceived as two separate volumes. On the ground floor, Wega.punt also provides space for businesses serving the local community.  

retail on the ground floor 

The ground floor beneath the car park levels comprises three commercial units, designed according to the ‘box-in-box’ principle, with a suspended ceiling. This construction method provides both thermal and sound insulation. The plinth is transparent and the spaces are intended for service-oriented businesses, which can be used by police staff as well as others. Examples include a dry cleaner’s, a parcel collection point or a bicycle repair service. A public passageway through the building connects Wegastraat with Orionstraat and can be locked in the evening.

260302 MG 4729 Lucas van der Wee

Lucas van der Wee

260302 MG 4715 Lucas van der Wee

Lucas van der Wee

260302 MG 4623 Lucas van der Wee

Lucas van der Wee

sustainable 

By utilising the existing office shell, the car park levels are nice and high. Should the police ever require more office space, the added sections can easily be removed: everything is bolted and nut-fastened. Without ramps, the courtyard receives sufficient natural light for either residential or office use. With Wega.punt, an existing shell has been saved from demolition and cleverly transformed through reversible interventions that make it future-proof. Roofs have been utilised for sedum and larger plants, insofar as the existing structure permitted.

green & cool 

The total green area covers approximately 60 per cent of the car park’s footprint. To support the local ecology, habitats for small animals have been integrated into the design. Bird boxes for various small birds and pipistrelle bats have been installed in the facades close to the green roof. The native shrubs on the roof are suitable for various butterfly species. The entire roof surface is fitted with retention crates that buffer rainfall and allow it to drain slowly, intended for watering the plants. In summer, they provide natural cooling for the building and the surrounding area.

260209 DJI 0509 Lucas van der Wee

Lucas van der Wee

260302 MG 4621 Lucas van der Wee

Lucas van der Wee

contact

mail bd@cepezed.nl or call our
business development team
on +31 (0)15 2150000

partners 

opdrachtgever: politie
constructies: imd raadgevende ingenieurs
advies installaties, bouwfysica en brandveiligheid: nelissen ingenieursbureau b.v.
bouwkostenmanagement: ingenieursbureau multical
hoofdaannemer: de vries en verburg

related projects

Police Headquarters The Hague

20201118 c001

Brightlands Chemelot car park

Exterieur parkeergarage brightlands chemelot cepezed

Smart Mobility Hub

Vogelperspectie smart mobility hub cepezed

Recent Vacancies Contact
Linkedin Youtube
nl nederlands   |   en english