Cookies that the site cannot function properly without. This includes cookies for access to secure areas and CSRF security. Please note that Craft’s default cookies do not collect any personal or sensitive information. Craft's default cookies do not collect IP addresses. The information they store is not sent to Pixel & Tonic or any 3rd parties.
Name: CraftSessionId
Description: Craft relies on PHP sessions to maintain sessions across web requests. That is done via the PHP session cookie. Craft names that cookie “CraftSessionId” by default, but it can be renamed via the phpSessionId config setting. This cookie will expire as soon as the session expires.
Provider: this site
Expiry: Session
Name: *_identity
Description: When you log into the Control Panel, you will get an authentication cookie used to maintain your authenticated state. The cookie name is prefixed with a long, randomly generated string, followed by _identity. The cookie only stores information necessary to maintain a secure, authenticated session and will only exist for as long as the user is authenticated in Craft.
Provider: this site
Expiry: Persistent
Name: *_username
Description: If you check the "Keep me logged in" option during login, this cookie is used to remember the username for your next authentication.
Provider: this site
Expiry: Persistent
Name: CRAFT_CSRF_TOKEN
Description: Protects us and you as a user against Cross-Site Request Forgery attacks.
Provider: this site
Expiry: Session
always active
Statistic cookies help us understand how visitors interact with websites by collecting and reporting information anonymously.
Marketing cookies are used to track visitors across websites. The intention is to display ads that are relevant and engaging for the individual user and thereby more valuable for publishers and third party advertisers.
Functional cookies are used for site functionality sourced from outside this website that are not pertinent to the site's main functionality, but provide additional functionality to enhance the user experience. Note that these can have their own cookie policies.
Name: vimeo
Description: https://vimeo.com/legal/privacy/cookies
Provider: Vimeo
Expiry: Persistant

we use cookies to personalize content and ads, and to analyze our traffic and improve our service.

| edit preferences
Cookies
  • projects
  • method
  • team
  • disciplines
    architecture project development construction coordination interior
    architecture project development construction coordination interior
  • Linkedin Youtube
    nl | en
  • nl | en

03 Jul 2025

university of twente renovates campus icon

Axonometrische schets horst complex cepezed

cepezed, Arup and Nelissen have won the tender for the redevelopment of the Horst Complex at the University of Twente. This iconic 1960s building, home to the Faculty of Engineering Technology (ET), is in urgent need of sustainability upgrades. Its current layout no longer supports contemporary methods of research and education. We propose a new spatial distribution of functions across the complex to foster social interaction and collaboration in a better way as well.


kindred spirits
The Horst Complex was designed by Dirk van Mourik and Jan-Willem du Pon. Built between 1964 and 1968, the structure fit seamlessly into the campus’s functionalist masterplan, with its tower becoming one of the site’s visual anchors. Van Mourik and Du Pon opted for a modular, prefabricated design - an approach that closely aligns with cepezed’s own architectural philosophy. We consider them kindred spirits, and their building feels intuitive to us. The client praised our technical and spatial analysis as “excellent.”

improved flow and functionality
There is significant potential for improvement in terms of routing and the positioning of functions. As such, we aim to keep the existing building as intact as possible. However, we do see opportunities to open up façades – using glass – and to increase the height at strategic points. This will improve usability and foster more encounters between users. We propose a tiered distribution from vibrancy, to background activity, to tranquillity – for example by placing social and educational functions in the low-rise carré and research functions in the high-rise and satellite buildings. In this way, the Horst complex better reflects the dynamics of the campus and the garden gains greater significance.

living lab
The client described our proposal as “clear, logical, and not overly complex, thereby improving user-friendliness.” Cepezed also distinguished itself from other candidates by proposing to transform the current Kleinhorst Laboratory into a living lab for harvested and bio-based materials. Given the sustainability ambitions of the project, we also carried out an in-depth analysis of the building services and shafts. We see particular potential in an integrated design approach and in the exploration of innovative climate-control systems.

comprehensive participation plan
With a decade of experience in over 47 transformation and renovation projects, cepezed sees a beautiful, iconic building full of promise. One key challenge is the space requirement, which currently exceeds the available square footage. We aim to resolve this in close consultation with users: building consensus is central to the success of this sustainable renovation and is a cornerstone of our extensive participation plan.


We can't wait to start off with the design team - Arup, Nelissen, cepezedinterieur, Vianen Bouwadvies and Ingenieursbureau Multical - and look forward to working with the University of Twente, the Campus and Facility Management Department and the Faculty of Engineering Technology.

Recent Vacancies Contact
Linkedin Youtube
nl nederlands   |   en english