Cookies that the site cannot function properly without. This includes cookies for access to secure areas and CSRF security. Please note that Craft’s default cookies do not collect any personal or sensitive information. Craft's default cookies do not collect IP addresses. The information they store is not sent to Pixel & Tonic or any 3rd parties.
Name: CraftSessionId
Description: Craft relies on PHP sessions to maintain sessions across web requests. That is done via the PHP session cookie. Craft names that cookie “CraftSessionId” by default, but it can be renamed via the phpSessionId config setting. This cookie will expire as soon as the session expires.
Provider: this site
Expiry: Session
Name: *_identity
Description: When you log into the Control Panel, you will get an authentication cookie used to maintain your authenticated state. The cookie name is prefixed with a long, randomly generated string, followed by _identity. The cookie only stores information necessary to maintain a secure, authenticated session and will only exist for as long as the user is authenticated in Craft.
Provider: this site
Expiry: Persistent
Name: *_username
Description: If you check the "Keep me logged in" option during login, this cookie is used to remember the username for your next authentication.
Provider: this site
Expiry: Persistent
Name: CRAFT_CSRF_TOKEN
Description: Protects us and you as a user against Cross-Site Request Forgery attacks.
Provider: this site
Expiry: Session
always active
Statistic cookies help us understand how visitors interact with websites by collecting and reporting information anonymously.
Marketing cookies are used to track visitors across websites. The intention is to display ads that are relevant and engaging for the individual user and thereby more valuable for publishers and third party advertisers.
Functional cookies are used for site functionality sourced from outside this website that are not pertinent to the site's main functionality, but provide additional functionality to enhance the user experience. Note that these can have their own cookie policies.
Name: vimeo
Description: https://vimeo.com/legal/privacy/cookies
Provider: Vimeo
Expiry: Persistant

we use cookies to personalize content and ads, and to analyze our traffic and improve our service.

| edit preferences
Cookies
  • projects
  • method
  • team
  • disciplines
    architecture project development construction coordination interior
    architecture project development construction coordination interior
  • Linkedin Youtube
    nl | en
  • nl | en

05 Apr 2019

design update research building vrije universiteit amsterdam

Straat onderzoeksgebouw vu cepezed

Since the design tendering for the new research building of the Amsterdam Free University in 2016, cepezed has enthusiastically been drawing. During the process, various programme changes took place. For example, the research programme has been expanded and the educational function has been reduced. In the end, the programme increased by approximately 5.000 m² to a total floor space of more than 27.000 m².

About 400 people will be employed in the research building. It will contain various types of generic laboratories, but also very specific research facilities such as high-quality vibration-free laser laboratories and space for electro microscopy. These are, for example, suitable for research into the interaction between light and matter. In addition, the building will accommodate offices, educational facilities, lab rooms and campus facilities such as catering and meeting and conference accommodation.

The building will be flexible and future-proof, so that it will remain suitable for various types of users and activities in the upcoming decades. In the field of sustainability, the objective is a BREEAM Excellent certification. Among other things, it will be provided with an aquifer thermal energy storage (ATES), solar panels on the roof, low-energy elevators, LED lighting and water-saving sanitary facilities.

In the meantime, both the Zuidas and the Amsterdam aesthetics committee have approved the definitive design, an important milestone. The project is now in the final phase of the technical design and the specifications are expected to be ready by the end of May. The opening of the new research building is planned for 2022.
Gevel onderzoeksgebouw vu cepezed

Atrium onderzoeksgebouw vu cepezed

Verdieping onderzoeksgebouw vu cepezed

Extrieur V Uonderzoeksgebouw cepezed

VU Research Building

amsterdam


Recent Vacancies Contact
Linkedin Youtube
nl nederlands   |   en english