Cookies that the site cannot function properly without. This includes cookies for access to secure areas and CSRF security. Please note that Craft’s default cookies do not collect any personal or sensitive information. Craft's default cookies do not collect IP addresses. The information they store is not sent to Pixel & Tonic or any 3rd parties.
Name: CraftSessionId
Description: Craft relies on PHP sessions to maintain sessions across web requests. That is done via the PHP session cookie. Craft names that cookie “CraftSessionId” by default, but it can be renamed via the phpSessionId config setting. This cookie will expire as soon as the session expires.
Provider: this site
Expiry: Session
Name: *_identity
Description: When you log into the Control Panel, you will get an authentication cookie used to maintain your authenticated state. The cookie name is prefixed with a long, randomly generated string, followed by _identity. The cookie only stores information necessary to maintain a secure, authenticated session and will only exist for as long as the user is authenticated in Craft.
Provider: this site
Expiry: Persistent
Name: *_username
Description: If you check the "Keep me logged in" option during login, this cookie is used to remember the username for your next authentication.
Provider: this site
Expiry: Persistent
Name: CRAFT_CSRF_TOKEN
Description: Protects us and you as a user against Cross-Site Request Forgery attacks.
Provider: this site
Expiry: Session
always active
Statistic cookies help us understand how visitors interact with websites by collecting and reporting information anonymously.
Marketing cookies are used to track visitors across websites. The intention is to display ads that are relevant and engaging for the individual user and thereby more valuable for publishers and third party advertisers.
Functional cookies are used for site functionality sourced from outside this website that are not pertinent to the site's main functionality, but provide additional functionality to enhance the user experience. Note that these can have their own cookie policies.
Name: vimeo
Description: https://vimeo.com/legal/privacy/cookies
Provider: Vimeo
Expiry: Persistant

we use cookies to personalize content and ads, and to analyze our traffic and improve our service.

| edit preferences
Cookies
  • projects
  • method
  • team
  • disciplines
    architecture project development construction coordination interior
    architecture project development construction coordination interior
  • Linkedin Youtube
    nl | en
  • nl | en

11 May 2022

Alleen maar bouwer

20220510 alleen maar bouwer 02b

"We only build what is drawn." I hear this more and more often in the run-up to a large construction project, sometimes in tenders based on TD (technical design) but certainly in construction team tenders on design documents. For a client or designer, this sounds good: what is contracted is built, whereas in the past, the ultimate quality limits of 'equivalence' were often sought in specifications.

Nevertheless, this position proves to be cause for caution. There is a good chance that a game between design and implementation responsibility is rigged with an oversimplification of the design and construction process. A contract document or even a UO (design for execution) drawn up by the designers is normally only regarded as a starting point for the preparation for execution, not as the end product. While the run-up to the implementation is a crucial phase in which suppliers are procured, detailed engineering is done and production drawings are made.

It is precisely in this phase that strong management with a great deal of coordination and fine-tuning is needed to achieve a good construction process and building. At such times, the 'we only build' contractors are actually saying that these activities belong to 'engineering' - i.e. design - and are not their responsibility. Requirements about airtightness and fire resistance, for example, should be resolved by the designers in the drawings, because securing these during construction is not seen as a primary responsibility.

Is this attitude an aftermath of the risky tenders during the construction crisis ten years ago? Is it a consequence of the current shortage on the labour market, as a result of which experienced work planners are scarce and a narrower interpretation of the task shifts this work off the plate? Or is it an interesting earnings model because you move from a contracted job to a billable job - a situation in which every detailed adjustment (sometimes almost at the level of a screw or a rubber) becomes the basis for difficult cost discussions.

At a time when we are facing major challenges due to high energy costs, material scarcity, the nitrogen dossier and circular construction, integral cooperation within the chain seems crucial to me. And the stretching of the boundaries and narrowing of the interpretation of tasks is a dead end.


Ronald Schleurholts, architect-partner cepezed

Cobouw, May 5th 2022

more columns

Recent Vacancies Contact
Linkedin Youtube
nl nederlands   |   en english