Cookies that the site cannot function properly without. This includes cookies for access to secure areas and CSRF security. Please note that Craft’s default cookies do not collect any personal or sensitive information. Craft's default cookies do not collect IP addresses. The information they store is not sent to Pixel & Tonic or any 3rd parties.
Name: CraftSessionId
Description: Craft relies on PHP sessions to maintain sessions across web requests. That is done via the PHP session cookie. Craft names that cookie “CraftSessionId” by default, but it can be renamed via the phpSessionId config setting. This cookie will expire as soon as the session expires.
Provider: this site
Expiry: Session
Name: *_identity
Description: When you log into the Control Panel, you will get an authentication cookie used to maintain your authenticated state. The cookie name is prefixed with a long, randomly generated string, followed by _identity. The cookie only stores information necessary to maintain a secure, authenticated session and will only exist for as long as the user is authenticated in Craft.
Provider: this site
Expiry: Persistent
Name: *_username
Description: If you check the "Keep me logged in" option during login, this cookie is used to remember the username for your next authentication.
Provider: this site
Expiry: Persistent
Name: CRAFT_CSRF_TOKEN
Description: Protects us and you as a user against Cross-Site Request Forgery attacks.
Provider: this site
Expiry: Session
always active
Statistic cookies help us understand how visitors interact with websites by collecting and reporting information anonymously.
Marketing cookies are used to track visitors across websites. The intention is to display ads that are relevant and engaging for the individual user and thereby more valuable for publishers and third party advertisers.
Functional cookies are used for site functionality sourced from outside this website that are not pertinent to the site's main functionality, but provide additional functionality to enhance the user experience. Note that these can have their own cookie policies.
Name: vimeo
Description: https://vimeo.com/legal/privacy/cookies
Provider: Vimeo
Expiry: Persistant

we use cookies to personalize content and ads, and to analyze our traffic and improve our service.

| edit preferences
Cookies
  • projects
  • method
  • team
  • disciplines
    architecture project development construction coordination interior
    architecture project development construction coordination interior
  • Linkedin Youtube
    nl | en
  • nl | en

21 Feb 2025

‘first tree’ police assembly site in drachten

250220 MG 0856 Lucasvanderwee

Last Thursday, the festive green light was given for the realisation of the new police assembly site in Drachten. The Police, cepezed and BAM Integrale Projecten Noord planted a tree together. For this assembly site, the landscape is at least as important as the buildings. The tree also symbolises the dynamic start and growing collaboration.

surrounded by water
For this sustainable project on the Azeven-Noord industrial estate in Drachten, the existing 112 emergency centre will be given a new wing. Across from it, a new building will be constructed for forensic research and a new boiler room. The location of the buildings is unique: the collection site in Drachten consists of islands and is therefore completely surrounded by water. The design by cepezed and BoschSlabbers Landschapsarchitecten fits in nicely with this.

integral design
The outdoor space will be designed as a park and will be accessible to employees. Because the buildings are not located directly on the water, the banks are wide enough for nature to develop, and plants have been added where possible in the more stone-filled areas, such as the car parks. In an integrated design, cepezed and BoschSlabbers have matched vistas and wooden decks to windows and entrances. The park layout and elegant arched bridges accentuate the islands' structure.

co2 reduction
cepezed designed an efficient, modular construction kit, with a special feature in each building, such as a patio or a skylight filled hall and wooden roof girders. The project includes several applications that further reduce CO2 emissions. For example, 50 percent of the steel structure is made from recycled steel ore melted in electric furnaces, and residual concrete is processed into concrete blocks for other purposes.

green-blue campus
With the realisation and future completion of the project, the police in northern Netherlands will combine their forensic activities, resulting in a more efficient and practical approach. The new building for forensic research and the boiler seizure house will be completed in May 2026. The entire project will be finished in March 2027, when the Police will have a green-blue campus.
250220 MG 6711 Lucasvanderwee

250220 DJI 0239 Lucasvanderwee


Recent Vacancies Contact
Linkedin Youtube
nl nederlands   |   en english