Cookies that the site cannot function properly without. This includes cookies for access to secure areas and CSRF security. Please note that Craft’s default cookies do not collect any personal or sensitive information. Craft's default cookies do not collect IP addresses. The information they store is not sent to Pixel & Tonic or any 3rd parties.
Name: CraftSessionId
Description: Craft relies on PHP sessions to maintain sessions across web requests. That is done via the PHP session cookie. Craft names that cookie “CraftSessionId” by default, but it can be renamed via the phpSessionId config setting. This cookie will expire as soon as the session expires.
Provider: this site
Expiry: Session
Name: *_identity
Description: When you log into the Control Panel, you will get an authentication cookie used to maintain your authenticated state. The cookie name is prefixed with a long, randomly generated string, followed by _identity. The cookie only stores information necessary to maintain a secure, authenticated session and will only exist for as long as the user is authenticated in Craft.
Provider: this site
Expiry: Persistent
Name: *_username
Description: If you check the "Keep me logged in" option during login, this cookie is used to remember the username for your next authentication.
Provider: this site
Expiry: Persistent
Name: CRAFT_CSRF_TOKEN
Description: Protects us and you as a user against Cross-Site Request Forgery attacks.
Provider: this site
Expiry: Session
always active
Statistic cookies help us understand how visitors interact with websites by collecting and reporting information anonymously.
Marketing cookies are used to track visitors across websites. The intention is to display ads that are relevant and engaging for the individual user and thereby more valuable for publishers and third party advertisers.
Functional cookies are used for site functionality sourced from outside this website that are not pertinent to the site's main functionality, but provide additional functionality to enhance the user experience. Note that these can have their own cookie policies.
Name: vimeo
Description: https://vimeo.com/legal/privacy/cookies
Provider: Vimeo
Expiry: Persistant

we use cookies to personalize content and ads, and to analyze our traffic and improve our service.

| edit preferences
Cookies
  • projects
  • method
  • team
  • disciplines
    architecture project development construction coordination interior
    architecture project development construction coordination interior
  • Linkedin Youtube
    nl | en
  • nl | en

28 Mar 2024

Just in time

Bouwupdate eenheidsbureau Jurriaan Brobbel gemeente Den Haag

Construction of the Eenheidsbureau on The Hague's Binckhorst is progressing steadily. There is limited space around the construction site of the Police, but with just-in-time delivery of prefabricated building elements, it all works out precisely. The construction cranes are positioned in the future stairwells. vast complex
The Hague is getting a vast new police complex. It is composed of five 'fingers', with a shaft, or 'canyon', at right angles to them. Completion is scheduled for 2025. Construction is progressing steadily and the contours of the building are already clearly visible. The construction consists of prefabricated elements. The façade follows the boundary of the plot, which curves around on one side. In the remaining space between the floor fields and the façade are triangular vides.
diverse functions
The functions within the building vary enormously - in fact, it is as if there will be five buildings next to and above each other. The Eenheidsbureau contains a cell complex and a workshop, as well as laboratories for forensic research, offices and parking spaces. Parking will be on the first, second and third floors, to leave room on the ground floor for ground-level functions.
construction traffic
Two of the three electric construction cranes are cleverly placed in the future stairwells. The third can be found at the future main entrance, where a long spiral staircase will be the eye-catcher of a high-ceilinged hall. The 'canyon' will soon contain spectacular ramps to and from the parking floors, but now comes in handy for construction traffic. Building a prefabricated structure requires less material on site, but construction requires meticulous planning.
storage
Consequently, there are two sites nearby to store the steel girders, beams, stability bracing, et cetera. They are supplied in sophisticated, just-in-time deliveries. In fact, the narrow space around the building is nothing more than a manoeuvring lane and the construction shed is positioned across the street. An architect from cepezed will be present on site there every Thursday until 2025.

→ Want to know more? View the project page here
20201118 c001

Cepezed

Birdview eenheidsgebouw den haag politie web

Cepezed


Recent Vacancies Contact
Linkedin Youtube
nl nederlands   |   en english