Cookies that the site cannot function properly without. This includes cookies for access to secure areas and CSRF security. Please note that Craft’s default cookies do not collect any personal or sensitive information. Craft's default cookies do not collect IP addresses. The information they store is not sent to Pixel & Tonic or any 3rd parties.
Name: CraftSessionId
Description: Craft relies on PHP sessions to maintain sessions across web requests. That is done via the PHP session cookie. Craft names that cookie “CraftSessionId” by default, but it can be renamed via the phpSessionId config setting. This cookie will expire as soon as the session expires.
Provider: this site
Expiry: Session
Name: *_identity
Description: When you log into the Control Panel, you will get an authentication cookie used to maintain your authenticated state. The cookie name is prefixed with a long, randomly generated string, followed by _identity. The cookie only stores information necessary to maintain a secure, authenticated session and will only exist for as long as the user is authenticated in Craft.
Provider: this site
Expiry: Persistent
Name: *_username
Description: If you check the "Keep me logged in" option during login, this cookie is used to remember the username for your next authentication.
Provider: this site
Expiry: Persistent
Name: CRAFT_CSRF_TOKEN
Description: Protects us and you as a user against Cross-Site Request Forgery attacks.
Provider: this site
Expiry: Session
always active
Statistic cookies help us understand how visitors interact with websites by collecting and reporting information anonymously.
Marketing cookies are used to track visitors across websites. The intention is to display ads that are relevant and engaging for the individual user and thereby more valuable for publishers and third party advertisers.
Functional cookies are used for site functionality sourced from outside this website that are not pertinent to the site's main functionality, but provide additional functionality to enhance the user experience. Note that these can have their own cookie policies.
Name: vimeo
Description: https://vimeo.com/legal/privacy/cookies
Provider: Vimeo
Expiry: Persistant

we use cookies to personalize content and ads, and to analyze our traffic and improve our service.

| edit preferences
Cookies
  • projects
  • method
  • team
  • disciplines
    architecture project development construction coordination interior
    architecture project development construction coordination interior
  • Linkedin Youtube
    nl | en
  • nl | en

14 Apr 2023

innovating further at the science park

plusultra_terras_cepezed

Cepezed

'Plus ultra' means even further. cepezed also innovates ever further on the Utrecht Science Park: after Nutricia Research, Genmab and Accelerator, Plus Ultra Utrecht becomes the fourth research building cepezed designs on the campus. Plus Ultra is the second project cepezed is realising commissioned by Kadans Science Partner. The start of construction was celebrated yesterday.

start-ups and scale-ups
The new building will soon offer combined office and laboratory spaces for companies in the life sciences sector, particularly aimed at start-ups and scale-ups.

vibrant core
A spacious and light atrium forms a vibrant core and connects to a south-facing terrace. The atrium is the place to meet. There is also a direct connection with the surrounding offices, laboratories and meeting rooms through balconies and walkways, among other things. The glass plinth will house a science gallery for exhibitions.

flexible
The layout of Plus Ultra is flexible. This is an important focus for the multi-tenant building. To accomplish this, cepezed designed a hybrid main supporting structure. This creates large spans and thus large floors that can be flexibly divided and fitted in. In this way, the building can easily adapt to the needs of both new and existing users.

high ambitions
The ambitions for sustainability are high. For instance, BREAAM-Outstanding and WELL Platinum certification will be achieved. Minimal energy consumption and optimal sustainability will be achieved, among other things, with PV panels on the roof and on the facades, a thermal energy storage system, the use of reusable materials wherever possible and a high degree of detachability.

The new building with over 22.880m² of floor space is expected to be completed by mid-2025.

Want to know more about the project? View the project page here.

Plusultra_render_cepezed

Cepezed

plusultra_atrium_cepezed

Cepezed

plusultra_concept_sketch

Cepezed


Recent Vacancies Contact
Linkedin Youtube
nl nederlands   |   en english