Cookies that the site cannot function properly without. This includes cookies for access to secure areas and CSRF security. Please note that Craft’s default cookies do not collect any personal or sensitive information. Craft's default cookies do not collect IP addresses. The information they store is not sent to Pixel & Tonic or any 3rd parties.
Name: CraftSessionId
Description: Craft relies on PHP sessions to maintain sessions across web requests. That is done via the PHP session cookie. Craft names that cookie “CraftSessionId” by default, but it can be renamed via the phpSessionId config setting. This cookie will expire as soon as the session expires.
Provider: this site
Expiry: Session
Name: *_identity
Description: When you log into the Control Panel, you will get an authentication cookie used to maintain your authenticated state. The cookie name is prefixed with a long, randomly generated string, followed by _identity. The cookie only stores information necessary to maintain a secure, authenticated session and will only exist for as long as the user is authenticated in Craft.
Provider: this site
Expiry: Persistent
Name: *_username
Description: If you check the "Keep me logged in" option during login, this cookie is used to remember the username for your next authentication.
Provider: this site
Expiry: Persistent
Name: CRAFT_CSRF_TOKEN
Description: Protects us and you as a user against Cross-Site Request Forgery attacks.
Provider: this site
Expiry: Session
always active
Statistic cookies help us understand how visitors interact with websites by collecting and reporting information anonymously.
Marketing cookies are used to track visitors across websites. The intention is to display ads that are relevant and engaging for the individual user and thereby more valuable for publishers and third party advertisers.
Functional cookies are used for site functionality sourced from outside this website that are not pertinent to the site's main functionality, but provide additional functionality to enhance the user experience. Note that these can have their own cookie policies.
Name: vimeo
Description: https://vimeo.com/legal/privacy/cookies
Provider: Vimeo
Expiry: Persistant

we use cookies to personalize content and ads, and to analyze our traffic and improve our service.

| edit preferences
Cookies
  • projects
  • method
  • team
  • disciplines
    architecture project development construction coordination interior
    architecture project development construction coordination interior
  • Linkedin Youtube
    nl | en
  • nl | en

20 May 2020

new schiphol pier in full glory

Exterieur nieuwe pier verkeerstoren schiphol airport cepezed

Photographer John Gundlach took a helicopter flight around the new Schiphol pier and got pretty close! The results show the pier under construction in full glory, with its massive scale and complexity. In a ‘bird’s-eye view’ a couple features and the latest developments:

unique & rare

At the new pier, aircrafts of different sizes and capacities will make use of the same gatehouse. Moreover, through these gatehouses, the pier will handle over twenty types of passenger flows for arrivals, departures and transfers within three different security regimes (in this case Schengen, Non-Schengen and Non-Schengen unscreened). This is unique for Schiphol, because it is not possible at any other pier at the airport. Worldwide it is rare, because it is not common at other airports either.

southwest gatehouses

The 400-meter-long pier will eventually have nine gatehouses, with a total of thirteen gates. Three large gatehouses can now be seen on the southwest side (photo 1). These are so-called MARS stands, which are each suitable for one large wide-body aircraft or two smaller narrow-body aircrafts at the same time. Later, two gatehouses will be added at the beginning of the pier (at the photo on the end). Each of these will be suitable for one wide-body aircraft or one narrow-body aircraft.

northeast gatehouses

Four gatehouses can be seen on the northeast side (photo 2). These are specific for narrow-body aircrafts. The gatehouse at the head (front of the photo) is suitable for two narrow-body aircrafts at the same time. The others are each suitable for one aircraft at a time.

façade sealing

The façade of the pier itself is now almost completely closed. And the gatehouse façades are also coming along pretty steady! The MARS stand at the head (front of photo 1) is progressing the most quickly: the insulated sandwich elements of timber sheets have already partly been placed and part of the glass has already been mounted as well. Consequently, the timber will be covered with profiled sheets and Alucobond. The gatehouses on the sunny southwest side will eventually have solar panels on the roof, which will contribute to the pier’s sustainability.

scale

As said, the new pier is over 400 meters long and that is quite large. To give an idea of its scale: the clearly visible red and white dotted line around the construction site is made up of sea containers! The new pier is undisputedly cepezed’s largest public project to date.
Exterieur nieuwe pier schiphol airport cepezed

Tekening dwarsdoorsnede voorzijde pier schiphol cepezed

Bouwtekening axonometrie nieuwe pier schiphol cepezed

Bovenaanzicht pier a schiphol cepezed

Exterieur gates pier a schiphol cepezed

new pier schiphol airport

haarlemmermeer


Recent Vacancies Contact
Linkedin Youtube
nl nederlands   |   en english