Cookies that the site cannot function properly without. This includes cookies for access to secure areas and CSRF security. Please note that Craft’s default cookies do not collect any personal or sensitive information. Craft's default cookies do not collect IP addresses. The information they store is not sent to Pixel & Tonic or any 3rd parties.
Name: CraftSessionId
Description: Craft relies on PHP sessions to maintain sessions across web requests. That is done via the PHP session cookie. Craft names that cookie “CraftSessionId” by default, but it can be renamed via the phpSessionId config setting. This cookie will expire as soon as the session expires.
Provider: this site
Expiry: Session
Name: *_identity
Description: When you log into the Control Panel, you will get an authentication cookie used to maintain your authenticated state. The cookie name is prefixed with a long, randomly generated string, followed by _identity. The cookie only stores information necessary to maintain a secure, authenticated session and will only exist for as long as the user is authenticated in Craft.
Provider: this site
Expiry: Persistent
Name: *_username
Description: If you check the "Keep me logged in" option during login, this cookie is used to remember the username for your next authentication.
Provider: this site
Expiry: Persistent
Name: CRAFT_CSRF_TOKEN
Description: Protects us and you as a user against Cross-Site Request Forgery attacks.
Provider: this site
Expiry: Session
always active
Statistic cookies help us understand how visitors interact with websites by collecting and reporting information anonymously.
Marketing cookies are used to track visitors across websites. The intention is to display ads that are relevant and engaging for the individual user and thereby more valuable for publishers and third party advertisers.
Functional cookies are used for site functionality sourced from outside this website that are not pertinent to the site's main functionality, but provide additional functionality to enhance the user experience. Note that these can have their own cookie policies.
Name: vimeo
Description: https://vimeo.com/legal/privacy/cookies
Provider: Vimeo
Expiry: Persistant

we use cookies to personalize content and ads, and to analyze our traffic and improve our service.

| edit preferences
Cookies
  • projects
  • method
  • team
  • disciplines
    architecture project development construction coordination interior
    architecture project development construction coordination interior
  • Linkedin Youtube
    nl | en
  • nl | en

16 Jul 2018

buidling bottleneck

Column 18 07 2018 bouwbottleneck ronald schleurholts cepezed

Whoever follows the news will not have escaped the emergency calls; the construction market is overstrained, tenders fail, and the delivery time and costs of construction products such as piles and insulation material are rising. Some builders are, paradoxically enough, in heavy weather because of the building hype; often after they have been awarded a project, they are confronted with higher purchasing costs and longer delivery times than they took into account when tendering. The shortage of well-trained and trained work preparation personnel that arose after the crisis is also a factor here.

So these are uncertain times: how do designers and builders price the procurement risk and make it manageable? Too much rebate makes a plan unfeasible before tendering. Moreover: which margin is still reasonable? In order to make efforts and risks manageable, builders increasingly expect a well-developed Technical Design.
More open processes with more transparency and fewer intermediary parties also provide an answer. With our design method based on prefabricated building, we have always realized part of our designs ourselves since the mid-nineties; partially contracted without a main contractor. A sister company fulfills the assignement, purchase and execution in the role of coordinating advisor. Both the process and the relationship between costs and quality are fully transparent. Very refreshing.

We are also realizing a number of our current projects in this way again. Initially apprehensive because of the above mentioned market reports about scarcity and availability, the practice turns out to be surprisingly different: piles, concrete floors, steel constructions, facades and installations ... all packages turn out well and on time within the original budgets.

This makes you think; is the real bottleneck in the construction sector perhaps not with the producers and suppliers, but with the purchase and work preparation of the (medium) large construction companies?

Ronald Schleurholts, architect-directeur cepezed

Cobouw, 16 juli 2018