Cookies that the site cannot function properly without. This includes cookies for access to secure areas and CSRF security. Please note that Craft’s default cookies do not collect any personal or sensitive information. Craft's default cookies do not collect IP addresses. The information they store is not sent to Pixel & Tonic or any 3rd parties.
Name: CraftSessionId
Description: Craft relies on PHP sessions to maintain sessions across web requests. That is done via the PHP session cookie. Craft names that cookie “CraftSessionId” by default, but it can be renamed via the phpSessionId config setting. This cookie will expire as soon as the session expires.
Provider: this site
Expiry: Session
Name: *_identity
Description: When you log into the Control Panel, you will get an authentication cookie used to maintain your authenticated state. The cookie name is prefixed with a long, randomly generated string, followed by _identity. The cookie only stores information necessary to maintain a secure, authenticated session and will only exist for as long as the user is authenticated in Craft.
Provider: this site
Expiry: Persistent
Name: *_username
Description: If you check the "Keep me logged in" option during login, this cookie is used to remember the username for your next authentication.
Provider: this site
Expiry: Persistent
Name: CRAFT_CSRF_TOKEN
Description: Protects us and you as a user against Cross-Site Request Forgery attacks.
Provider: this site
Expiry: Session
always active
Statistic cookies help us understand how visitors interact with websites by collecting and reporting information anonymously.
Marketing cookies are used to track visitors across websites. The intention is to display ads that are relevant and engaging for the individual user and thereby more valuable for publishers and third party advertisers.
Functional cookies are used for site functionality sourced from outside this website that are not pertinent to the site's main functionality, but provide additional functionality to enhance the user experience. Note that these can have their own cookie policies.
Name: vimeo
Description: https://vimeo.com/legal/privacy/cookies
Provider: Vimeo
Expiry: Persistant

we use cookies to personalize content and ads, and to analyze our traffic and improve our service.

| edit preferences
Cookies
  • projects
  • method
  • team
  • disciplines
    architecture project development construction coordination interior
    architecture project development construction coordination interior
  • Linkedin Youtube
    nl | en
  • nl | en

19 Mar 2020

building contract research building vu signed

nieuws zuidas onderzoeksgebouw vu vrije universiteit amsterdam cepezed

These are strange days, but fortunately we also have good news: last Monday March 16th, the Free University (VU) and the building consortium of TBI companies J.P. van Eesteren and Croonwolter&dros signed the building contract for the new VU research building! cepezed and cepezedinterieur made the integral design, which was BREEAM-NL Excellent certified in the autumn of 2019, despite the complex design challenges.

complex education and research functions

The circa 27.500 m² research building will be located on the VU campus along the Amsterdam Zuidas. It will accommodate a range of complex functions and facilities for education and research in the fields of, among others, neuroscience and oncology. For example, it will house education spaces, science classrooms, laboratories, vibration-free laser facilities and, for example, rooms for electron microscopy. Much needed campus facilities such as catering and meeting facilities are also provided.

sustainability ambitions

The project suitably fits the sustainability ambitions of the university. For example, we designed a building with plenty of daylight and green roofs, among other things. The research building will also be equipped with solar panels, LED lighting, water-saving sanitary facilities, energy-efficient equipment and elevators, presence detection, good facilities for garbage separation and an aquifer thermal energy storage (ATES).

vibration-free laboratories

In connection with sensitive laser configurations, it was important to render part of the installations fully vibration-free. The laboratories in the building are realized at ML (Medical Laboratory) level ll. This sets high standards for air pressure regimes, circuits for technical gases, power supplies, data connections and so on. The building consortium will not only take care of the realization of these aspects, but also of the the validation and commissioning.

Construction is expected to start around the summer of 2020. The new building is another important step in the development of the VU Campus. It contributes to its sustainability, to the renewal of the beta cluster housing and to the overall research infrastructure.
Straat onderzoeksgebouw vu cepezed

Gevel onderzoeksgebouw vu cepezed

Atrium onderzoeksgebouw vu cepezed

Verdieping onderzoeksgebouw vu cepezed

Extrieur V Uonderzoeksgebouw cepezed

VU Research Building

amsterdam


Recent Vacancies Contact
Linkedin Youtube
nl nederlands   |   en english