Cookies that the site cannot function properly without. This includes cookies for access to secure areas and CSRF security. Please note that Craft’s default cookies do not collect any personal or sensitive information. Craft's default cookies do not collect IP addresses. The information they store is not sent to Pixel & Tonic or any 3rd parties.
Name: CraftSessionId
Description: Craft relies on PHP sessions to maintain sessions across web requests. That is done via the PHP session cookie. Craft names that cookie “CraftSessionId” by default, but it can be renamed via the phpSessionId config setting. This cookie will expire as soon as the session expires.
Provider: this site
Expiry: Session
Name: *_identity
Description: When you log into the Control Panel, you will get an authentication cookie used to maintain your authenticated state. The cookie name is prefixed with a long, randomly generated string, followed by _identity. The cookie only stores information necessary to maintain a secure, authenticated session and will only exist for as long as the user is authenticated in Craft.
Provider: this site
Expiry: Persistent
Name: *_username
Description: If you check the "Keep me logged in" option during login, this cookie is used to remember the username for your next authentication.
Provider: this site
Expiry: Persistent
Name: CRAFT_CSRF_TOKEN
Description: Protects us and you as a user against Cross-Site Request Forgery attacks.
Provider: this site
Expiry: Session
always active
Statistic cookies help us understand how visitors interact with websites by collecting and reporting information anonymously.
Marketing cookies are used to track visitors across websites. The intention is to display ads that are relevant and engaging for the individual user and thereby more valuable for publishers and third party advertisers.
Functional cookies are used for site functionality sourced from outside this website that are not pertinent to the site's main functionality, but provide additional functionality to enhance the user experience. Note that these can have their own cookie policies.
Name: vimeo
Description: https://vimeo.com/legal/privacy/cookies
Provider: Vimeo
Expiry: Persistant

we use cookies to personalize content and ads, and to analyze our traffic and improve our service.

| edit preferences
Cookies
  • projects
  • method
  • team
  • disciplines
    architecture project development construction coordination interior
    architecture project development construction coordination interior
  • Linkedin Youtube
    nl | en
  • nl | en

23 Mar 2022

112 control room east-netherlands in completion phase

Meldkamer apeldoorn linksvoor 4920 lucasvanderwee cepezed

The structural work on the 112 control room for the east of the Netherlands in Apeldoorn has been completed. The facade is nearly wind and watertight. The finishing touches will be applied in the coming months. The emergency control room is a design by cepezed, with cepezedinterieur designing the fixed and loose furnishings.

eye-catching
The striking construction, consisting of two large building volumes stacked at right angles to each other, was put up in approximately one year. The most eye-catching part is the large overhanging section with the transparent end wall. Not only does this offer a splendid view, it also looks like a 'watchful eye to the surroundings'. Furthermore, the corten steel façades have a robust and warm appearance, which fits in well with the green surroundings. From an urban planning point of view, the design also fits in with existing buildings in the vicinity.

largest in the Netherlands
The new control centre in Apeldoorn for the police, fire brigade and ambulance service will be one of the largest in the Netherlands. The joint building has three connected atriums. This provides daylight, sightlines and links between the various functions. The installations are designed into the mass of the building and are therefore almost invisible. Furthermore, the large span of the building allows for a very flexible layout.

energy-neutral
The control room is almost energy-neutral (BENG-certified). The nearby 'solar carport' makes a visible contribution to the sustainability goals. It provides shelter from the rain and generates energy. Electric charging stations are also located under this car park, which is covered with PV panels. In this way, renewable energy is used directly.

building process
The main contractor Friso Bouwgroep and installer Lammerink started building the control room at the beginning of last year. According to the plan, the building will be completed at the end of May. cepezedinterieur will take care of the fixed and loose furnishings, after which the building will be taken into use at the end of 2022. The following are also involved in this project: engineering firm Nelissen, IMd raadgevende ingenieurs, landscape architect BoschSlabbers and lighting expert Robert Jan Vos.
Meldkamer apeldoorn omgeving 5071 lucasvanderwee cepezed

Meldkamer apeldoorn overhanging 5010 lucasvanderwee cepezed

Meldkamer apeldoorn carport 4905 lucasvanderwee cepezed

Meldkamer apeldoorn binnenzijde 4993 lucasvanderwee cepezed


Recent Vacancies Contact
Linkedin Youtube
nl nederlands   |   en english