Collaboration
The +ACDC consortium was set up to design the new building. This comprised cepezed, engineering consultants Deerns and ABT and Cure+Care consultancy. Together, the parties were responsible for the ‘total design’.In addition, cepezedinterieur designed the permanent fittings, in particular in all the public and patient-accessible areas.