Cookies that the site cannot function properly without. This includes cookies for access to secure areas and CSRF security. Please note that Craft’s default cookies do not collect any personal or sensitive information. Craft's default cookies do not collect IP addresses. The information they store is not sent to Pixel & Tonic or any 3rd parties.
Name: CraftSessionId
Description: Craft relies on PHP sessions to maintain sessions across web requests. That is done via the PHP session cookie. Craft names that cookie “CraftSessionId” by default, but it can be renamed via the phpSessionId config setting. This cookie will expire as soon as the session expires.
Provider: this site
Expiry: Session
Name: *_identity
Description: When you log into the Control Panel, you will get an authentication cookie used to maintain your authenticated state. The cookie name is prefixed with a long, randomly generated string, followed by _identity. The cookie only stores information necessary to maintain a secure, authenticated session and will only exist for as long as the user is authenticated in Craft.
Provider: this site
Expiry: Persistent
Name: *_username
Description: If you check the "Keep me logged in" option during login, this cookie is used to remember the username for your next authentication.
Provider: this site
Expiry: Persistent
Name: CRAFT_CSRF_TOKEN
Description: Protects us and you as a user against Cross-Site Request Forgery attacks.
Provider: this site
Expiry: Session
always active
Statistic cookies help us understand how visitors interact with websites by collecting and reporting information anonymously.
Marketing cookies are used to track visitors across websites. The intention is to display ads that are relevant and engaging for the individual user and thereby more valuable for publishers and third party advertisers.
Functional cookies are used for site functionality sourced from outside this website that are not pertinent to the site's main functionality, but provide additional functionality to enhance the user experience. Note that these can have their own cookie policies.
Name: vimeo
Description: https://vimeo.com/legal/privacy/cookies
Provider: Vimeo
Expiry: Persistant

we use cookies to personalize content and ads, and to analyze our traffic and improve our service.

| edit preferences
Cookies
  • projects
  • method
  • team
  • disciplines
    architecture project development construction coordination interior
    architecture project development construction coordination interior
  • Linkedin Youtube
    nl | en
  • nl | en
Entree theater De Lievekamp cepezed

Lievekamp Cultural Centre

clients(s)

Municipality of The Hague, Municipality of Oss & Theatre De Lievekamp

location

oss

users(s)

Theatre De Lievekamp & Muzelinck

Oss puts itself on the map with the most circular theatre in the Netherlands. The new home of Theatre De Lievekamp consists of the relocated Zuiderstrand Theatre from Scheveningen and the existing theatre hall in Oss. A chic, playful façade brings fresh vitality to the venue. The new theatre is suitable for a wide range of cultural offerings and, as before, also accommodates the cultural centre Muzelinck.
BCC0133zw

luchtfoto_ontmanteling_zuiderstrandtheater

Lucas van der Wee

developments at raadhuislaan 

Through a housing development project commissioned by Lister Buildings, cepezed became involved in the plans for the Raadhuislaan in Oss, where De Lievekamp is also located. Lister made its plot available for the realisation of the theatre's intended new building, allowing it to remain open to the public during construction. As a result, cepezed's design expanded from housing development to an urban planning project, including a larger theatre. At the same time, lcp-circulair(a joint venture between cepezedprojects and Lagemaat) was engaged in a tender from the Municipality of The Hague for the dismantling of the Scheveningen Zuiderstrand Theatre. It was a case of perfect timing, especially given the sustainability ambitions of the Municipality of Oss and the theatre’s commitment to the project.

building with a story 

The Zuiderstrand Theatre is being dismantled by lcp-circulair and stored in Oss, where it will be reassembled as the new main auditorium (900 seats) of De Lievekamp. The existing hall of De Lievekamp will become the middle auditorium (350 seats), and a small studio theatre (100 seats) will also be added. In addition to these performance spaces, the venue will feature foyers and offices, a state-of-the-art ‘back of house’, as well as studios and workshops used by cultural centre Muzelinck. A theatre is already an inspiring building by nature, but incorporating reuse makes it even more remarkable. This is undeniably a building with a story. A perfect example of this philosophy is how the individual light fixtures from the Zuiderstrand Theatre will soon be clustered into a dazzling, circular chandelier.
Cultureel centrum lievekamp axo begane grond

Zaal theater De Lievekamp cepezed

Cepezed

zuiderstrandtheater_scheveningen_lagemaat_cepezed

Lucas van der Wee

repurposed staircase void 

cepezed believes that transformation and reuse should always outweigh new construction. From our other circular projects, we have learned that a relocated building functions best when it retains its original purpose. This approach minimises material waste. The Zuiderstrand Theatre is being reconstructed almost one-to-one, though the main auditorium has been adapted and optimised for its new use in Oss. The staircase void has been repurposed, now featuring a new, two-storey high bar unit with mezzanines on both sides. Structurally, the design has been slightly modified as well (some bracing elements have been repositioned to enhance functionality).

internal street 

A bright, daylight-filled space between the former Zuiderstrand Theatre and the existing Lievekamp auditorium serves as an internal street, providing clarity and cohesion. Extending from the central public entrance, this space houses the cloakroom and the entrance to the middle auditorium. The internal street acts as a sound buffer while also harmonising the ‘colliding’ materials, structures, and floor heights that naturally come with circular construction. Recognisable theatre colours (deep blue and rich red) feature prominently in and around the auditoriums, while the rest of the spaces remain neutral, allowing the materials and natural light to take centre stage. Thanks to the introduction of this internal street, the floor plan remains compact. During construction, it also serves as a safety divide, ensuring that the current auditorium remains in use while the main auditorium is being built, and vice versa.
Binenenstraat De Lievekamp cepezed

Cepezed

Schetsontwerp doorsnede

Cepezed

next level puzzle 

An architectural design is always a puzzle, especially for a complex project like a theatre. Backstage and public routes must remain separate, theatre technology requires a significant amount of space, and the building must be visually appealing both while full or empty. Choosing circularity takes this challenge to the next level, as reused components must be integrated as completely as possible to minimise environmental impact. This process requires recognising the aesthetic and structural potential of existing elements while ensuring functionality remains the top priority. The result is unmistakably cepezed: architecture with a high level of detailing, a pleasant and harmonious spatial layout, abundant natural light, and optimal efficiency in use.
Bar1 De Lievekamp cepezed

Cepezed

Lounge1 De Lievekamp cepezed

Cepezed

curtain façade 

The façades will soon radiate more of a theatrical atmosphere than they do now. The recessed glass base allows passersby to take a glimpse at the activity inside. Above, perforated aluminium panels are draped around the building in a vertical rhythm, reminiscent of the folds of a stage curtain. In certain areas, such as near the foyer of the studio theatre, this ‘curtain’ is strategically ‘drawn aside.’ Where windows sit behind the panels, the perforations still provide enough visibility to the outside. Upward-facing lighting at the base of the folds further enhances the building’s theatrical character. But once inside, visitors will discover many more beauty, just as one would expect from a theatre and cultural centre.
Exterieur zijaanzicht De Lievekamp cepezed

Cepezed

contact

mail bd@cepezed.nl or call our
business development team
on +31 (0)15 2150000

partners 

developer: lcp circulair (cepezedprojects & lagemaat)
dismantling: Lagemaat
interieur design: cepezedinterieur
light design: lichtconsult
theatre consultant: PBTA
structural engineer: Aronsohn
installation consultant: Nelissen

related projects

Temporary Courthouse

Exterieur avond tijdelijke rechtbank cepezed

The Green House

Omgeving groen the green house cepezed

Theatre Speelhuis

Tribune theater speelhuis cepezed

Recent Vacancies Contact
Linkedin Youtube
nl nederlands   |   en english