Temporary and lively
Our assignment was to design a temporary stopgap for the site: the location would not be filled with permanent construction for another 15 years. cepezed therefore developed a plan in which both the function and the architecture are fully circular.The Green House accommodates a circular restaurant concept with meeting facilities. Additionally, in accordance with the principles of circularity, the kit of parts building can be completely disassembled. Including its foundations of prefab concrete blocks. After use on this location, it can be easily taken apart and rebuilt elsewhere.