previous page
nederlands search route & contact
next page

construction dsm in full swing

The construction of the cepezed-designed Biotechnology Center on the DSM campus in Delft is in full swing. The new building is part of the master plan for the reorganisation of the grounds, which cepezed also designed. The building has been designed to be as clean-lined and compact as possible and is characterized by a sharp division between the office and laboratory functions. The building has a structural design with large spans, so that the floor slabs have the least number of columns possible and can be arranged extremely flexibly. The heart of the contains an atrium that includes a fully glazed panorama lift. The framework of the first floor has already been constructed.

previous page
next page